Project specifications
Public contracting authority: Shucheng Water Company
Construction company: Shucheng Siyuan Municipal Engineering Company
Trenchless pipeline Length: 138 meters
Application: water supply, crossing road
DN: 500
This project is to establish a water supply pipeline along No. 206 national road, so as to realize the water diversion from Chuanqiutang water plant to Shucheng No.2 water plant.
In the pipeline, a section of trenchless pipeline is needed to cross the Wanfohu express way.
Project features
- Crossing road
- Breaking the Wanfohu express way is forbidden in construction
Outcome
138-meter ZMU pipeline crossing Wanfohu express way
Service
- Technical assistance on site