Project specifications
Public contracting authority: Ashghal, Public Works Authority
Contractor: Daewoo Engineering & Construction
Length: 31 kilometers
Application: Sewerage Effluents
DN: 1 200
This project is an initiative by the Public Works Authority, Ashghal and this is one of the four contracts that make up the New Orbital Highway. It includes the construction of a main double roadway that will stretch for 44 kilometers. Within this roadway, there will be five different interchanges. It will be located to the West and North of Doha, Qatar.
Saint-Gobain PAM contributes towards the major infrastructure improvement by supplying 31 km of ductile iron pH1 pipes for the sewage effluent network. In addition to the supply of the pipe system, Saint-Gobain offers technical support throughout the installation of the project. Our technical team is always present from inspecting the pipes from the first delivery to providing repairing and pipe laying trainings to the on-site engineers.